XIAOCHONG / PRODUCT & SUPPLY SCOPE

AC EV Charger Control Boards, PCBA and SKD Components

Separate AC charger mainboard supply from a complete SKD kit. Compare 7, 11, 14, 22 and 44 kW integration tracks and request free technical documents.

Define the product and supply scope.

Start with a documented BOM and revision: board only, prewired electronics or the agreed AC SKD kit. Define assembly work, firmware configuration, inspection records and repair responsibilities before the pilot. Component relay markings are not the charger’s output current rating.

Supply options
Mainboard PCBA can be ordered separately; SKD components follow an agreed BOM
Application tracks
7 / 11 / 14 / 22 / 44 kW AC charger integration; not interchangeable ratings
14 kW dual-output reference
Two 7 kW / 32 A charging outputs; confirm supply topology using factory wiring documents
OCPP and network
Firmware, OCPP integration, Wi-Fi/4G/Bluetooth modules and backend scope selected per project
Additional components
HMI, RFID reader, wiring harness, status strip, enclosure and cable selected and quoted separately

Request free AC or DC technical documentation.

Xiaochong recruits businesses interested in local charger production and assembly. Two separate tracks are available: AC EV charger SKD kits and AC technical documentation, and DC EV charger SKD kits and DC technical documentation. Specify the track when requesting free technical documents through xc0225888@163.com, sales 1 +8613717726888 or sales 2 +8613425806997.

SKD components, production/assembly technical support and repair/maintenance technical support are defined in the project. Free documentation does not mean free hardware, unrestricted source code, all intellectual property, certification, training, repair labour or exclusive territory rights. Exact models, kit contents, document revisions, training/testing/support scope and licensing must be agreed.

Official distributor, EPC and manufacturing-partner program ↗

Matching MIC product references.

Public listing references checked October 7, 2026. A listing is not a model-specific certificate or a delivery commitment.

Search the complete public MIC collection ↗

Define the configuration before ordering.

Product-family information is not an installation approval. Confirm the exact model, connector, supply, output allocation, integration, documentation and destination-market requirements in the quotation. Images can show a selected or illustrative finish; delivered hardware and options follow the agreed bill of materials.